Mudjacking vs. Replacement Cost Calculator
Compare the same slab area. Use national planning ranges or your own Milwaukee quotes.
Example · national planning ranges
Same area · estimates, not a quote
Example · 200 sq ft · national planning ranges
Upfront cost comparison
These ranges overlap. A lower lifting price is possible, but savings are not assured.
Lifting: $4–$9/sq ft, subject to a $300–$700 minimum. Replacement: $8–$18/sq ft including removal.
Or call 414-219-1661. Estimates are not a quote or a slab assessment.
Compare written quotes or add known extras
Enter your own allowances for drainage, sealing or other work outside the base scope. Zero means no allowance has been added.
Use all-in totals for the same area, including required drainage, demolition, disposal, base work, permits and taxes. Extras above are ignored in quote mode.
Cost evidence reviewed October 20, 2026. Maintained by Milwaukee's Concrete Contractor. No verified Milwaukee price survey is available for these defaults. Rates, sources and limits
How this calculator works
Enter the square footage of the panels you would lift or replace. For a rectangle, multiply length by width in feet. Add the areas of separate panels together. Compare the same area for both methods; replacing a whole driveway and lifting one panel are different projects.
The defaults use national installed-cost guides, reviewed October 20, 2026. Use them to budget for private, plain concrete flatwork. Source dates appear with each rate; an on-site quote establishes the price for your property.
HomeGuide’s mudjacking data, dated November 5, 2025, gives $4–$9 per square foot and minimum charges of $300–$700. The calculator applies the minimum at each end of the range: the lower result is the larger of area × $4 and $300; the upper result is the larger of area × $9 and $700. Ordinary setup and lifting labor are included in that planning rate.
For replacement, HomeGuide’s removal and replacement guide, dated May 27, 2025, gives $8–$18 per square foot for tearing out and replacing a slab. Removal is already included. Adding a separate demolition rate would count it twice. Small replacement jobs can exceed this area-based estimate because a contractor’s minimum charge is not modeled here.
Two other independent sources give useful context. Angi’s August 31, 2026 project data gives an overlapping $3–$8 per square foot lifting range. Thumbtack’s June 2, 2026 data reports $903–$3,192 for national mudjacking projects of varying sizes. A whole-project range cannot reliably become a per-square-foot rate without knowing the areas involved.
Base ranges exclude taxes, permits, drainage corrections, decorative finishes and major base rebuilding. Use the optional extras fields for your own allowances, or switch to written quotes with those items already included. No ZIP-code adjustment, inflation factor or assumed repair lifespan is applied. Planning ranges round outward to $10; entered quotes retain cents.
Example: a 200 sq ft section
A 10 ft × 20 ft section has an area of 200 sq ft. Mudjacking comes to $800–$1,800; removal and replacement comes to $1,600–$3,600 before excluded extras. Those ranges overlap between $1,600 and $1,800, so the estimate cannot promise that lifting will save money.
These examples use the same published rates, with no extra allowances. Each example includes one lifting minimum.
| Affected area | Mudjacking budget | Replacement budget |
|---|---|---|
| 25 sq ft | $300–$700 | $200–$450; minimum may raise this |
| 100 sq ft | $400–$900 | $800–$1,800 |
| 200 sq ft | $800–$1,800 | $1,600–$3,600 |
| 400 sq ft | $1,600–$3,600 | $3,200–$7,200 |
What should change your decision?
An intact panel that has settled may be a candidate for concrete mudjacking. Crumbling surfaces, loose pieces or widespread cracking need an assessment before any lifting comparison is useful. Lifting changes elevation and support; it does not give worn concrete a new surface. For broader driveway damage, review the scope of driveway replacement.
Access and hidden voids also matter. A hose route through a narrow gate, a large cavity under a small panel or several disconnected work areas can change a quote. The visible drop does not reveal the full volume that needs filling. This tool avoids assigning a price multiplier to conditions it cannot measure.
Drainage deserves its own line in the scope. Ask where the water comes from and what will keep it from undermining the slab again. Read about preventing driveway settlement if movement follows rain or runoff. A lower lifting price is less useful if the cause remains untreated.
For Milwaukee public sidewalks and driveway approaches, check with the City before arranging work. Milwaukee’s homeowner guidance distinguishes private concrete flatwork from work affecting the public way, which needs separate DPW approvals and permits. The calculator withholds estimates for that setting. A private path can be reviewed through our sidewalk and walkway service.
Questions about lifting versus replacing
Is mudjacking always cheaper than replacement?
No. Minimum charges can make a small lift expensive per square foot, and difficult access or a large void can raise the total. The estimated ranges may overlap. Compare all-in written quotes for the same panels, then consider whether lifting can achieve the needed elevation and support without leaving damaged concrete in place.
Can badly cracked concrete be mudjacked?
It needs an assessment first. A slab broken into loose pieces or crumbling at the surface may need replacement even when a generic lifting estimate looks attractive. Choosing “Broken / crumbling” withholds the lifting figure and savings comparison. For uncertain damage, our concrete repair assessment can help establish which options deserve a quote.
How do I compare two written quotes fairly?
Use the same repair area and ask what each total includes. Check demolition, disposal, base preparation, hole patching, joint or crack sealing, drainage, permits and taxes. In quote mode, enter the complete totals; the calculator adds no allowances. It compares upfront prices only. Warranty terms, exclusions and the proposed repair should still influence the decision.
How long will mudjacking last?
This calculator does not predict a lifespan. Continued soil movement, drainage, the slab’s condition and the repair scope affect how well a lift holds. Ask the contractor what caused the settlement, how that cause will be addressed and what the written warranty covers. A low initial price alone cannot establish the better long-term value.
Is this a foam concrete lifting calculator?
No. The lifting rates here apply to traditional cement-based mudjacking. Polyurethane foam is a different method with different pricing and installation details. If one written quote is for foam and another is for replacement, you can compare their totals, but the mudjacking label and default rates do not describe the foam work. Confirm the method before using an estimate.
Should I lift a patio that drains toward the house?
Have its slope, thresholds and water route assessed before choosing a repair. A price comparison cannot determine a safe target elevation or diagnose what is below the slab. For concrete patio work, ask whether the proposed lift or replacement will correct the drainage problem and whether separate grading or runoff work is needed.
Call 414-219-1661 or use the quote form below with the panel dimensions, photos and notes about water or movement. An on-site assessment can turn this planning comparison into a scope and price for your property.